From 7 Operators to 1: How a 70% Reduction in Cycle Time Changed the Game for This Manufacturer
The production team at a well-known shaft and Gear manufacturer was tired. Their inspection process was slowing everything down. The existing system could only check one type of shaft, and every time they needed to change parts, it took hours to set up again. To make things worse, the machines were so complicated that only … Read more